Putting more emphasis on testing each and every aspect of the system before its release to the End User.
Extensive tests are performed at all stages of production to meet and exceed MIL-STD/MIL-SPEC requirements.
Spending 30% of our time testing parts and components, followed by 40% testing compatibility and functionality mid-
production, and lastly 30% is spent calibrating and performing post-production tests.
With emphasis on quality and reliability– the equipment of our clients needs to support them for any operation, in any
setting, because there is no room for error. These devices are manufactured to reflect that philosophy: We offer an
unmatched 7-Year Limited Warranty, industry leading specifications with no limitations for thermal cores and intensifier
tubes.